New-build double glazing

Double glazing for new build homes, Perth

Building new? uPVC double glazing is easiest to get right at the design stage: specified once, built into the frame, and finished before handover. We work directly with your builder or design team from drawings through to installation.

Why choose GaBe

The benefits

  • Specified once, built into the design: no retrofit compromises
  • Clean lines and a wide choice of colours and finishes for a cohesive look across every elevation
  • One point of contact from drawings through to handover
  • Backed by the same GaBe warranty as every install

What does uPVC double glazing mean?

uPVC (unplasticised PVC) frames are rigid, weather-resistant profiles that don't corrode and need no repainting. The material itself limits heat transfer through the frame, so no separate thermal break is needed the way aluminium frames require.

Inside each frame sits an insulated glass unit (IGU): two panes separated by a sealed, gas-filled cavity. Low-E coatings cut radiant heat transfer, laminated panes add safety or extra noise control, and toughened glass is used where the job calls for it. Multi-point locking and compression gaskets round out the seal, which is what actually delivers the airtightness behind the energy and acoustic performance.

Design decisions worth making early

Confirm your glazing specification, including glass build-up and gas fill, and think about orientation: north- and west-facing elevations often benefit from a different glass spec than the rest of the house.

Choose your opening styles for ventilation, egress and cleaning access early, and make sure stacked sliders or large openings have a continuous wall or sill detail to bear the load properly. Good head, jamb and sill drawings prevent improvisation on site, and compliance items (glass safety, fall prevention, wind and water ratings) are easier to coordinate before framing than after.

Procurement and scheduling

We work from your architectural set to compile sizes, opening directions and hardware, and resolve duplicate openings as one line with a quantity rather than repeating drawings unnecessarily.

Locking in specifications before framing sign-off keeps lead times from holding up the build program, and a sample IGU or small on-site mock-up is worth the time whenever finish or performance is critical.

Installation and quality control

Openings need to be plumb, level and sized to the specified tolerances, with continuous support at the sill for stacker doors and wide sliders. Membranes, flashing tapes and backer rods have to be sequenced correctly: perimeter sealing isn't just cosmetic, it's what preserves the thermal and acoustic performance the specification promised.

We check gasket compression and multi-point lock operation on every install, since small adjustments here often show measurable gains in air infiltration tests, and we hand over a full record of IGU specifications, hardware schedules, maintenance guidance and warranty terms.

Acoustic and thermal tips that add value

Asymmetrical pane thicknesses can reduce certain noise frequencies better than a symmetrical stack, and laminated glass improves both safety and sound attenuation. External shading such as eaves or screens, paired with Low-E coatings, can cut cooling loads without overly darkening the interior.

Combining window placement with cross-ventilation reduces how much mechanical cooling you need in the shoulder seasons.

Life-cycle and maintenance

Routine care is simple: wash frames and glass with a mild detergent, and check drainage paths and weep holes stay clear. Inspect gaskets and lubricate moving parts as the hardware manufacturer recommends.

An IGU is serviceable, and keeping documentation on hand makes a like-for-like replacement straightforward years later. Many uPVC systems are recyclable at end of life.

Common misconceptions

“uPVC discolours quickly.” Modern UV-stabilised formulations are far more stable than older material, and reputable profile manufacturers back their material with long cosmetic warranties.

“All double glazing performs the same.” Frame design, spacer type, gas fill, coatings and installation quality all affect the outcome, so the specification and the installer matter equally.

“Bigger glass is always better.” Large spans need careful structural detailing, the right safety glass and verified deflection limits to keep the seal and airtightness intact.

Working with a single-responsibility provider

Many project teams prefer one partner for survey, manufacture, installation and warranty, to cut down on coordination overhead. What makes that work is transparent communication and technical alignment from the outset, with documented quality checks at every stage: how we run every new-build job.

Supply only, or supply + install?

Choosing GaBe for both supply and installation means one team is accountable for the fit, the seal and the finish, not two. Professional installation also protects the properties the units are designed to deliver: a unit fitted out of square or without a proper seal won't perform the way a well-installed one does.

Sometimes a builder buys the units from us and installs them with their own crew. That's a supply-only arrangement, and it's common on new-build sites. If a builder supplies and installs the units themselves, we can't be responsible for how well that installation is done.

Choosing supply and install with GaBe means our own trained team measures, manufactures and fits every unit, with the same installation warranty and aftercare as every other GaBe job. One crew handles everything from delivery to installation, with no multi-vendor coordination and minimal disruption to the build programme. The whole service is designed to give you lasting value from your investment.

Frame colours

A premium range to match any home, inside and out.

White

Golden Oak

Nut Tree

Grey

Anthracite

Ash Black

What it's made of

Profiles

Deceuninck (Belgium) profiles

Glass

Cooling Brothers Glass
Walshs Glass

Hardware

Roto hardware
SIEGENIA hardware

Working with your build program

01

Drawings & take-off

We work from your architectural set to confirm sizes, opening directions and hardware for every opening.

02

Specification sign-off

Frame colours, opening styles and hardware finalised before framing sign-off, so lead times don't hold up the build.

03

Site coordination

Delivery and installation aligned with your building program: openings ready, sequencing agreed in advance.

04

Installation & sealing

Frames fitted, sealed and finished to the same standard as every GaBe install.

05

Handover documentation

A full record (hardware schedule, warranty terms and maintenance guidance) for future reference.

Quieter inside
30 dB
Material warranty
10-year
Manufacturing time
4–6 weeks
Client satisfaction
98%

Recent new build projects

Full gallery →
uPVC windows fitted to a steel-framed new build before cladding is complete
uPVC window frames delivered to site and stacked ready for installation
Windows installed in a brick new-build shell with the roof framing still exposed
uPVC windows fitted to a new build still wrapped in building membrane, scaffold in place

Perth owned & operated · Australian made

Ready to get started?

Get a free, no-obligation quote for your project.